Thursday, April 11, 2019

On Generation IV Nuclear Plants

Subtitle: Safer and Cheaper, or Just Make-Work Projects?

Tonight, 4-11-2019, the South Texas Section of AIChE will have the monthly dinner meeting, at which the presentation will discuss the research and status of Generation IV nuclear power plants.  This topic is the result, most likely, of the mis-guided belief by the current Section leadership that man-made climate change requires non-carbon-based electric power generation.  Therefore, they say, more nuclear plants should be built.  And, since no one can deny that the existing crop of nuclear power plants are far too dangerous and far too costly, they see a need for a new generation of nuclear designs.   This article poses a few questions I would ask, given the opportunity, about these planet-saving Gen IV nuclear power plants. 

What is a Gen IV plant?  These are, according to the NRC, nuclear plant designs that do not use light water as a moderator in the reactor.  At present, the existing plants use boiling water, or high pressure water in the reactor core as neutron moderators.  These have been shown to be far too expensive, as stated above.   The Gen IV plants will use various other things, such as graphite spheres in a high-temperature gas reactor (HTGR), molten fluoride salt in the reactor (MSR), or various molten or liquid metals in the reactor (molten lead, molten sodium, e.g.) .  

The questions, for now, include these:  What is the safety for Gen IV?  Will these plants require subsidies?  What is the on-line  capacity factor, or reliability of Gen IV?  What is the cost to construct?  What is the cost to operate?  What is the cost to decommission?  What are the issues with long-term spent fuel?

Safety

Will Gen IV reactors be safe, so safe that there is no longer an absolute need for the US government to provide damage payments for a catastrophic nuclear incident?  At present, every reactor enjoys such protection under the Price-Anderson Act.  Insurance companies refuse to insure nuclear plants, above a modest amount that is required by federal law.   Will these plants have materials of construction that operate reliably and safely for decade after decade?  We note that molten fluoride salts had serious metal cracking and embrittlement in earlier tests, are there proven alloys today that provide a safe operating system?

Subsidies

Will Gen IV plants require the numerous subsidies that current generation of light water reactors have?  SLB has articles on the numerous subsidies, such as liability for radiation leaks via the Price-Anderson Act, construction loan guarantees, new reactor direct subsidies for the first 10 years of operation, making lawsuits during construction almost impossible, and others.

Capacity Factor

Will Gen IV reactors run at 90 percent output year after year, for 40 years or more?  Will these exotic materials, molten lead, molten sodium, molten fluoride salts, create operating problems that shut the plant down routinely?  Test reactors over the years have had very serious drawbacks with pumping such materials, to name just one. 

Cost to Construct  

Will Gen IV plants be built at a low cost, so they can actually compete in the electricity market?  We see that pressurized water reactors now have an outrageous cost, of $12 billion for a 1000 MWe output.   How can anyone know what the costs to build will be?  The industry has time after time given low-ball initial costs, then see the actual costs balloon to 3, 4, and 5 times that initial cost.   

Cost to Operate

Will Gen IV plants have a low cost to operate, so that they can actually compete in the market?  We see today that plant after plant in the US cannot compete, even on their cash costs.  Current plants are shutting down, or crying to the government for more and more subsidies to keep the plants operating.   

Cost to Decommission

Will Gen IV plants require billions of dollars, and decades of time to decommission when the plants finally close?  Who provides that money?  Will it be a government subsidy, like the light water reactors now enjoy?

 Long-term Issues with Spent Fuel

Will the Gen IV reactors have spent fuel that must be stored, guarded, and cooled for centuries?  What are those radioactive byproducts, and what are the toxicity issues?  What requirements will be made to ensure many generations are safe from deadly radiation from these plants?

These questions will suffice, for now.   I hope to ask a question or two.

UPDATE:  The meeting concluded, my thoughts and comments are on the next post at this link.  end update 4-12-2019


Roger E. Sowell, Esq.
Houston, Texas
copyright (c) 2019 by Roger Sowell - all rights reserved



Topics and general links:


Nuclear Power Plants.......here
Climate Change................here  and here
Fresh Water......................here
Engineering......................here  and here
Free Speech.................... here
Renewable Energy...........here  

Tuesday, August 21, 2018

Bechtel Bails - Botched Budget

Subtitle:  New Nuclear Plant in Wales has Budget Escalation Before Construction

Bechtel, the giant engineering, procurement, and construction (EPC) company with extensive nuclear plant experience, reportedly has withdrawn from the construction of a new nuclear power plant in Wales, UK, the Wylfa Newydd plant.  The reason given is the plant has escalating costs and Bechtel cannot make a profit on the contract.   The plant hasn't even started construction yet.  see link  The quote from Asahi Shimbun:  ". . . the overall costs estimated by Bechtel are higher than Hitachi’s, making it impossible for Bechtel and Hitachi to agree on the price tag."

As a result, Bechtel decided to withdraw from its key role in construction and only offer a consulting service.

This plant is to have two reactors of the ABWR type, Advanced Boiling Water Reactors licensed by Hitachi.  Total electrical output is 2,700 MWe, with each reactor providing half.  

Bechtel will take on an advisory or consulting role, and another company will be the builder.   The problem with that is the builder has zero experience in building an entire nuclear power plant.   Having an inexperienced builder is exactly what got the Olkiluoto plant in Finland in so much trouble.  Olkiluoto has the French design, the EPR for European Pressurized Reactor.  

Bechtel:  "We look forward to continuing to bring our expertise to the construction of the UK’s next new nuclear power station at Wylfa Newydd in our role as Project Management Contractor.”  Project Management Contractor generally is the term for the Owner's representative that oversees the Builder's work.  

This one will be quite interesting to follow in the coming years. 

Roger E. Sowell, Esq.
Houston, Texas
copyright (c) 2018 by Roger Sowell - all rights reserved



Topics and general links:

Nuclear Power Plants.......here
Climate Change................here  and here
Fresh Water......................here
Engineering......................here  and here
Free Speech.................... here
Renewable Energy...........here  

Monday, September 4, 2017

The Wisdom of Nuclear Plant Operating in a Flood

Subtitle: Very Risky Activity to Operate A Nuclear Plant with No Evacuations Possible

Very recently, a Category 4 Hurricane, Harvey 2017, came ashore on 25 August near Corpus Christi, Texas in the United States.   The weather fronts were such that the hurricane moved inland only approximately 50 miles, stalled there, then moved southward back over the Gulf of Mexico on 28 August.   The weather front north of the hurricane weakened, such that the hurricane or tropical storm system then moved parallel to the Texas coast in a north-easterly direction before crossing the shore near the Texas-Louisiana border and moving northward up the Mississippi River valley.   
Figure 1.  Location of South Texas Nuclear Plant and Houston
source: google maps


The slow movement over land and over water for the second time resulted in heavy rains over much of southeast Texas and parts of Louisiana.  In many Texas locations, records for rainfall in one storm event were broken.   Just over 50 inches of rain fell in at least one location.   Rivers swelled, overflowed, and many set new records for high levels.  Property was flooded in thousands of locations.   A set of two artificial dams just to the west of Houston, Texas (Barker and Addicks dams) were filled to the danger point.  The water operating authorities chose to release water from the reservoirs behind the dams to prevent catastrophic dam failures.   That water release flooded thousands more homes. 

Many roads were underwater in Houston and surrounding areas, including major freeways.  

No evacuation order was issued for the large, populous city of Houston, Texas.  Instead, the mayor advised the residents to shelter in place.   There were, however, a number of mandatory and voluntary evacuations ordered in other smaller cities and towns.    

The mayor stated publicly that it was impossible to safely evacuate 3-4 million people in such short time, citing the recent failed evacuation attempt for Hurricane Rita.   There were also many deaths on the highways in that failed evacuation attempt. 

Meanwhile, with all the flooding over such a widespread area, the 2,700 MW twin-reactor nuclear power plant located only 70 miles southeast of Houston's downtown area, kept running at full power.  (see figure 1)  The South Texas Project Nuclear Operating Company chose to keep running, at least in part to further their reputation as the nuclear plant with the highest on-stream factor in the US. 

The question explored here is, was it wise to keep the STP (South Texas Project) operating at all during the flooding period of several days, when it would be impossible to evacuate the population located downwind of the plant if a massive radiation release event occurred. 

The fundamental issue is that nuclear plants certainly can meltdown, as at least five have done so in the past.  (Three Mile Island, Chernobyl, and three each at Fukushima-Dai-ichi).   All nuclear plants must have an evacuation plan, per government requirements.  That evacuation plan is predicated on the affected population having the means to evacuate.  

Clearly, the huge area in south and east Texas had no means to evacuate after the flooding began.  

It appears that the STP made it through the flooding and high winds, but were they simply lucky this time?   A look at the events that cause nuclear plants to shut down suddenly, without warning, shows that even the smallest problem can result in a shutdown.   A pump can breakdown, a valve can stick, a steam generator tube can rupture, just to list a few. 

It is also necessary to consider whether the electricity grid was or would be stressed if the STP shut down.  The Texas grid operator is ERCOT, for Electric Reliability Council of Texas.  It certainly appears that ERCOT did not need the power from the nuclear plant, with so much of the service area without power due to the winds and flooding.  

Instead, it appears the nuclear plant owners and operators placed their reputation for onstream days, for high onstream factor, above the safety of the public in the fourth largest metropolis in the country.  Knowing the city could not evacuate even if they tried, they kept running the reactors, pumping electricity into the grid when nearly one-fourth or more of the state's electric customers could not take power even though they wanted to. 

And, why would a business take such a risk?  In this case, it is entirely due to the federal government taking almost all the financial liability from harm and damage created by a radiation incident.    The Price-Anderson Act pays for all damages above a stated amount.  The nuclear plant itself would not pay for much, at all.  (see link to SLB articles on nuclear and Price-Anderson Act)

Surely the entire liability scheme must be re-examined in light of these events.   

For anyone other than a nuclear plant that is protected by the Price-Anderson Act provisions, operating with reckless disregard for human life, or operating in a normal manner that is reckless in the circumstances, can be a criminal act. 

The nuclear power plants must be shut down, and as soon as possible.   Millions of lives are at stake, or damaged forever for those that survive a nuclear meltdown with high winds that blow the radioactive particles into their homes, their businesses, and their very lungs.  

Roger E. Sowell, Esq.
Marina del Rey, California
copyright (c) 2017 by Roger Sowell - all rights reserved




Topics and general links:

Nuclear Power Plants.......here
Climate Change................here  and here
Fresh Water......................here
Engineering......................here  and here
Free Speech.................... here
Renewable Energy...........here 



Saturday, July 22, 2017

Nuclear Plants at VC Summer in Dire Straits

Subtitle:  The Bad News Keeps Piling On

The bad news just keeps rolling in for the nuclear power industry.  Besides the Vogtle twin-reactor project having long delays and $billions in cost overruns, the twin-reactor project in South Carolina is now being considered for simple abandonment.  see link to article "Economist predicts spike in power bills if SCE&G nuke project moves ahead."  dated 18 July 2017.  

The Summer nuclear plant expansion, like Vogtle, has two Westinghouse AP-1000 pressurized water reactors under construction.   These are supposed to be the best the US has to offer, with the "AP" in the name standing for "Advanced Passive."  These supposedly are faster and lest costly to construct due to their advanced design features.    Apparently not. 

These are pressurized water reactors, PWR, with twin steam generators per reactor.  The Passive portion in the name refers to an elevated water storage tank and dispersion system that is supposed to give the plant operators more time to sort things out when everything goes horribly wrong.  

The cost estimate at Summer keeps increasing, which is normal for nuclear power plants.  However, what is not usual is the call to stop the construction - 30 percent complete at this time - and save all the money that would be required to finish the plant.   

Financing this plant was done by increasing the monthly bill for ratepayers, the customers.  That is unusual in itself.  

The plant's detractors state there is no need for the power from the plant expansion.  The existing generating assets apparently have plenty of capacity without the new reactors.   In practice, that would mean that if and when the two reactors are finished, and they start running, some other plants must either throttle back substantially, or shut down.   That is not a good solution.  

The nuclear power industry is in sad shape these days.  One must wonder about the wisdom of building new reactors in times when existing plants are shutting down because they lose too much money.  

Roger E. Sowell, Esq.
Marina del Rey, California
copyright (c) 2017 by Roger Sowell - all rights reserved


Topics and general links:

Nuclear Power Plants.......here
Climate Change................here  and here
Fresh Water......................here
Engineering......................here  and here
Free Speech.................... here
Renewable Energy...........here  



Thursday, March 16, 2017

Ninth Anniversary of SLB - Musings

Today, 3/16/2017, marks the ninth anniversary of SLB.  Just a short article to mark the occasion. 

The world has certainly changed, in many areas, in the past nine years.   The Obama administration came and went, with all the changes (some good, some not so good) that that brought.  The Trump administration is now in charge, and the results are necessarily not yet in.   The US EPA is certainly in for some changes, as is the US State Department.  Climate change is no longer high on the list of either agency, because the underlying science is too shaky to bet trillions of dollars.  

Nuclear power plants in the US are shutting down and have shut down, almost all for reasons related to economics: their high operating costs and inability to compete.  Natural gas abundance is high and price is low.  More importantly, renewable power from wind turbines is at an all-time low break-even price (4.3 cents per kWh), and solar from PV is not far behind.  Both wind and solar will become even less expensive in the very near future.   The first offshore wind power facility in the US started up just a few months ago.  Future installations will be much more economic.   

 Coal power plants are shutting down in record numbers, primarily because the de-facto environmental exemption they enjoyed for decades was finally brought to an end - Obama did that.   It will be quite interesting to see if President Trump reverses Obama on this, and allows coal plants to keep running.  In any event, the US has only a few years of economically-producible coal in the ground, as SLB articles showed.   Approximately 15-20 years of coal are available at current prices.  

Hawaii, the state, has announced plans to have 100 percent renewable energy within a very few years, which makes great sense for them.  Their conventionally-fired power plants yield a consumer price upwards of 25 cents per kWh.  Renewables with storage can certainly beat that.   Kudos to my Hawaiian associates. 

Grid-scale storage in the mainland US is already a reality, and growing less expensive each year.   Southern California has many MW of battery storage in service, with another 20 MW/80MWh battery under contract from Tesla.  

Climate change science has come under greater and greater scrutiny as the much predicted warming has simply not occurred over the past 20 years.   Some panicked scientists once again change their calculation methods in an attempt to show a warming where none exists.  This refers to the adjusting of sea surface temperature data to try to show a warming trend in the combined air-ocean data.   Meanwhile, the pristine areas where USCRN sites exist show no warming, instead a cooling occurred from 2005 until the 2015-16 El Niño made a temporary warming blip in the data.    The sunspots have virtually disappeared since January 2017, though, which is very early in the sunspot cycle for such to happen.  It will be quite interesting to watch the cooling that is inevitable.   More importantly, it will be quite fun to watch the main-stream climate scientists try to talk (and write) their way out of the box they find themselves in.  

There has been a bit of activity in lawsuits to hold ExxonMobil accountable for some securities violation, in which it is alleged that Exxon knew decades ago that their primary products, petroleum and natural gas, would cause the planet to warm rapidly from the CO2 released in their consumption.   All this is predicated on there actually being a warming that occurred due to CO2 increase from 300 to 400 ppm, parts per million.   SLB has several articles that show the measured warming from 1900 to 1998 is due to at least seven other causes, none of which is CO2.  (increased housing and population density in cities, increased energy use per capita, decreased air pollution, increased local humidity from human activity, changed temperature site conditions from rural to urban, long-term drought, and buildings that create wind-shadows.)

As to water, especially here in the desert Southwest and West, the six-year drought has ended with a big flurry of winter storms - after the El Niño has passed.   The big rains from El Niño fell north of California last year, leaving California mostly dry.  The rains and snow came this year, to the surprise of NOAA scientists.   The present situation in California is a monster snowpack that is ready to melt, and reservoirs full to the brim throughout the state.   Clearly, the state water managers must release huge amounts of precious water into the rivers and the ocean to make room for the meltwater.   Farmers are furious.    I have contended here on SLB that more reservoirs are simply not in the future for California, because more water leads to more population.   California elites want a smaller population, not more people.

My best to all who read SLB, and please remember that every comment is moderated by me.  

Roger E. Sowell, Esq.
Marina del Rey, California
copyright (c) 2017 by Roger Sowell - all rights reserved
Topics and general links:

Nuclear Power Plants.......here
Climate Change................here  and here
Fresh Water......................here
Engineering......................here  and here
Free Speech.................... here
Renewable Energy...........here 


Wednesday, August 24, 2016

US Still Has the Can-Do Attitude from the Apollo Program

Subtitle:  Renewable Energy and Grid Integration have Plenty of Can-Do

A commenter asked me an excellent question the other day on another forum.  My reply follows the question.   This is about providing safe, reliable, affordable, and environmentally responsible power to the US grid, in the near future as nuclear plants shut down in great numbers and coal is more scarce.  


He asked: 

“The U.S.A. used to be a “Can-do” country. Now people go around wringing their hands and saying, “But what if…?”. Meanwhile, China is building nuclear power plants, while we give Iran’s mullahs hundreds of $billions to build nuclear bombs. Are our priorities screwed up, or what?”

My reply:  

We are still very much a can-do country, at least the fellows are that I hang around with. We look at coal, nuclear, natural gas, wind, solar, ocean current, and the various storage technologies. The best answer we have is that nuclear has zero chance of improvement, because we’ve given it our best shot for decades and that was one helluva shot. Nuclear can never compete. I’ve written on this in depth on my blog.

Coal is a losing proposition, not because of technology but because of limited resources. It is a solid fact that current prices limit recoverable coal to less than 20 years in the US, and 50 years world-wide. see link  Perhaps government will subsidize coal by $1 or $2 per ton produced, which would be only $9 to $18 billion (in US dollars) annually worldwide. That would increase coal’s economic life by a few years at most. Then what?

The can-do attitude is in finding much more natural gas than anyone ever expected via precision directional drilling and hydraulic fracturing in shale deposits. Lucky for mankind, shale deposits occur world-wide.

The can-do attitude is also alive in designing and installing economic wind turbines and solar PV systems. Sandia Labs has a fabulous new design for a flexible-blade wind turbine that continues to provide power in high winds. see link  and this link  That will cause capacity factors to skyrocket. New tower materials will allow 300 meter hub heights, with 50 MW turbine-generators. The combination of more output and greater size will make wind power even more attractive.

The best, and perhaps most important can-do attitude is in power plants that harvest electricity from the oceans’ currents. Those are renewable, inexhaustible, environmentally benign, and hold far more energy than mankind will ever need. The plants are not yet economic, but they will be. It’s just a matter of time. see link 

The can-do attitude is very much alive with battery innovators and inventions, such as the BioSolar halogenated polyactylene super battery. That is not science fiction, it is a reality. As I wrote on my blog, and others posted elsewhere, the HPA battery is a game-changer. Tesla has already made electric cars, while not perfect and not yet economic, his new car the Tesla 3 will be close to economic.

Finally, he stated “If today’s media was around in the 1960’s, we never would have gone to the moon.”

We had mass media in the 1960s. The media was on-board because we also had a fear that the Russians would occupy the high ground of outer space and drop rocks on our cities. Big ones. The rocks, that is. I remember those times, with the can-do attitude coupled with careful research and data acquisition by sober, somber and talented people. We didn’t fudge the numbers just to get the desired result. Rockets exploded or fell out of the sky without that, as it was. Space is a very unforgiving place. Physics had to be right, and the engineering had to be solid. I grew up in Houston in the 1960s and my family knew some of the important players in the Space Race. I met and got to know Astronaut Gus Grissom’s younger son.

Today’s climate scientists with all their data manipulation, making up data, using false statistics, should never be allowed anywhere near a space program.

My personal view is that the climate or global warming scare today is taking the place of the Soviets-in-space scare of the 1960s. The global warming scare is spurring innovation in certain industries that will be very beneficial long-term as the Earth runs out of economic coal and nuclear plants close by the hundreds, yet the people still need electricity.

see link  to SLB article of 2014:  "Forecasting the Future - Hubris or Honesty: Coal Exhaustion Looms - Renewable Energy to the Rescue"

Roger E. Sowell, Esq.
Marina del Rey, California

copyright (c) 2016 by Roger Sowell - all rights reserved 




Saturday, April 19, 2014

The Truth About Nuclear Power - Part 12

Subtitle: Nuclear plants cannot provide cheap power on small islands
This article explores the idea of using nuclear power plants to reduce the power prices on
Island in the South Pacific
numerous islands.
  The evidence shows that nuclear power would increase the power prices, not decrease them. 
Previously, the articles on The Truth About Nuclear Power showed that (one) modern nuclear power plants are uneconomic to operate compared to natural gas and wind energy, (two) they produce preposterous pricing if they are the sole power source for a grid, (three) they cost far too much to construct, (four) use far more water for cooling, 4 times as much, than better alternatives, (five) nuclear fuel makes them difficult to shut down and requires very costly safeguards, (six) they are built to huge scale of 1,000 to 1,600 MWe or greater to attempt to reduce costs via economy of scale, (seven) an all-nuclear grid will lose customers to self-generation, (eight) smaller and modular nuclear plants have no benefits, (nine) large-scale plants have very long construction schedules even without lawsuits that delay construction, (ten) nuclear plants do not reach 50 or 60 years life because they require costly upgrades after 20 to 30 years that do not always perform as designed, and (eleven) France has 85 percent of its electricity produced via nuclear power but it is subsidized, is still almost twice as expensive as prices in the US, and is only viable due to exporting power at night rather than throttling back the plants during low demand.   

As written almost 5 years ago on SLB, Nuclear Plants on Islands – A Nutty Idea, see link, there are no nuclear power plants located on islands that have approximately 1 million population.  Such islands could easily support power from a 1,000 MW reactor.  The construction costs are far too high, one plant is far too inflexible in operations, and it is cheaper for islanders to import fuel oil or LNG and generate power that way.  Using fossil fuel is far safer, too.  So, how about smaller modular plants, perhaps 4 of them at 300 MW each, which allows for one to be down for maintenance.   The reason this is not done is economy of scale pushes the power price far above 60 cents per kWh.  It’s cheaper for the islands to burn fuel oil to generate power and pay 25 cents per kWh.   
Here are the 15 islands with populations from 0.8 million to 1.25 million people, and no nuclear power plants.

Island ……………….population, millions
Okinawa………………...1.25
Mauritius………………...1.245
Bohol…………………….1.23
Hong Kong……………….1.18
Mindoro…………………..1.16
Xiamen Island…………...1.08
Sao Luis Island……….…1.08
Trinidad…………………...1.03 (this island has abundant natural gas, so of course is not a candidate)
South Island (NZ)……..…1.008
Oahu……………………...0.876
Tenerife………………..…0.865
Cyprus………………..…..0.855
Grand Canary………..…..0.815
Majorca………………..…0.814
Reunion (France)…….….0.793

The same is true for the five islands with 4 to 5 million population: Singapore, Sicily, Bali, and two in the Philippines.  There, the grid could use one 1,000 MWe nuclear plant and provide roughly one-fourth or one-fifth of the total power.  Or, the utility could build multiple smaller reactors to provide 5 GW of power, 5 at 1GW, 10 at 500 MW, 15 at 333 MW, 20 at 250 MW, etc.  But, they have not.   Power prices would still be far too expensive due to economy of scale.   Larger plants provide lower-cost power, while smaller plants produce more expensive power.  
For the smaller islands listed above, multiple small reactors could also be installed but would increase prices far too much due to economy of scale.
It is notable that two contenders in the small, modular reactor market recently failed to attract any customers or any investors.  See link.  Modular reactors and their various problems were discussed at some length in part 8 of the series.  See link. 
Conclusion

Despite having to burn imported oil or LNG, the many small islands in the world have not adopted nuclear power as a means of reducing their power prices.  The island of Oahu, for example, charges approximately 25 cents per kWh for power based on oil and a small amount of imported natural gas.  Even if small modular reactors were built to provide operating flexibility, nuclear plants cannot provide cheap power on small islands.  The claim by nuclear advocates that nuclear power is cheap is simply not supported by the evidence of all the islands in the world that presently provide expensive power.  If nuclear were indeed cheaper, the islanders would likely adopt that.  

 Previous articles in the Truth About Nuclear Power series are found at the following links.  Additional articles will be linked as they are published. 














Roger E. Sowell, Esq.

Marina del Rey, California


Thursday, April 17, 2014

Modular Nuclear Reactor Vendors Cut Funding

Modular reactor developer scales back 

B& W cuts development, funding by 90 percent due to lack of customers and lack of investors.  (Imagine that...)  "Babcock & Wilcox will slash its spending on the mPower
Westinghouse SMR
(small modular reactor) Concept
source: NRC
small modular reactor project, having failed to find customers or investors."  


"With the DoE arrangement now one year old, B&W hoped to have secured a number of utility customers for the small reactor as well as investors keen to take a majority share in its development. Spokesperson Aimee Mills told World Nuclear News that B&W had been unsuccessful in these aims, "There was interest from customers and interest from investors, but none have signed on the dotted line." "

Also, from the same article:   "In February this year (2014) Westinghouse announced it would scale back its development of its 225 MWe small modular reactor design, having lost out in the DoE competition."  see link from World Nuclear News, 4/14/14 

As posted earlier on SLB, small, modular nuclear reactors have little chance (zero, actually) of competing in the market due to the adverse effects of economy of scale (it's more expensive to make smaller plants) that outweigh any benefits from modularized construction.  see link to earlier SLB article. 

Roger E. Sowell, Esq.
Marina del Rey, California



Monday, April 14, 2014

The Truth About Nuclear Power - Part Eleven

Subtitle: Following France in Nuclear is Not the Way to Go

Update 4/15/14:  included comparison of France electricity prices to US prices; included another reference for the EU Commission investigation of low power prices in France. -- Roger

To summarize the first ten articles, it has been shown (one) that modern nuclear power plants are uneconomic to operate compared to natural gas and wind energy, (two) they produce preposterous pricing if they are the sole power source for a grid, (three) cost far too much to construct, (four) use far more water for cooling than better alternatives, (five) nuclear fuel makes them difficult to shut down and requires very costly safeguards, (six) are built to huge scale of
Nuclear Plants in France
source: Wikicommons
1,000 to 1,600 MWe or greater to attempt to reduce costs via economy of scale, (seven) an all-nuclear grid will lose customers to self-generation, (eight) smaller and modular nuclear plants have no benefits, (nine) large-scale plants have very long construction schedules even without lawsuits that delay construction, and (ten) nuclear plants require costly upgrades after 20 to 30 years that do not always perform as designed.


This article, number eleven in the series, discusses a favorite topic of the nuclear proponents, France and their nuclear power plants.  France, they say, has cheap electricity and obtains 80 percent of their electricity from nuclear power plants.  France, they say, actually exports power to other countries.   They say these as if those are good things.  The reality is quite different. 

Nationalized Electric Industry

Just after World War II, France nationalized the electric utility industry.  Until very recently, EDF, the French utility, was government-owned.  It is now a combination of private and government ownership.  see link to EDF website for the company history.   When a country nationalizes an industry, the government has no obligation to pay for the assets, or if it does pay, to pay fair market value.  The country also can, and often does, subsidize the construction of new assets such as nuclear power plants.  This leads to the second point.

Subsidized Power Pricing

France could, and did, set power prices at the point it chose, without any requirement to pay for assets, loans, bonds, or any other fixed costs.  French power pricing reflects the ongoing cost of operation such as fuel, labor, and maintenance.  In effect, the nationalized industry allowed France to subsidize the electric prices, which subsidizing did happen.  see link

There is also the matter of tarTAM,  a subsidized rate for large and medium-sized customers.  This is to be eliminated in 2015, but has been in effect for years.   

French subsidized prices were Investigated for anti-trust by the EU.  (see previous link) 

When one is not required to pay for the capital cost of assets, or can bury the costs within the labyrinth of government coffers, it is easy to charge below-market electricity prices. 

Update 4/15/14:  The EU Commission's report of 2007 of their investigation into power pricing in France concluded: "The Commission has assessed the aid element in the two regulated tariff systems as applied to non-household consumers. It found that these regulated tariffs were financed at least in part through state resources. It also concluded that, as far as the ‘yellow’ and ‘green’ options were concerned, the tariffs conferred a selective benefit on certain non-household consumers and that they affected trade between Member States."  (emphasis added)   source: see link.

In addition, The 2013 prices for electricity in France and the US were, per the IEA 2013 Key World Energy Statistics, slide 43  (see link) :  France industrial power price, 11.6 cents per kWh compared to US at 6.7 cents, and residential price at 17.5 cents per kWh compared to US at 11.9 cents per kWh.   This shows that France, with almost a full nuclear-powered grid, charges approximately double for industrial power (11.6 vs 6.7), and approximately 50 percent more for residential prices (17.5 vs 11.9).   French prices would surely be much higher, if France did not export power but had to throttle back each night, and if subsidies were fully forbidden.   -- End update --  Roger

Export Electricity 

France does indeed export electricity, but it is necessary to investigate to see why this is.  EDF exports power, mainly at night to neighboring countries, to increase production rate and avoid load reductions in the nuclear plants.  This is the problem as described in Part Two of the Series, that being nuclear plants are very difficult to operate and load changing is difficult and dangerous.  

Night exporting to neighboring countries acts the same as wind energy in the US, it forces load-following plants in the neighbor countries to reduce load or go off-line.   Thus, France is benefiting while neighbors take the burden of part-load, unloaded plants, and increased maintenance from severe load swings.   It is little wonder that the EU investigated. 

Subsidized Exported Plant Technology

France is desperate to sell nuclear power plants, and subsidizes the plant costs to be built in other countries (e.g. India).    France wanted 16 cents per kWh for the power sales price, but India negotiated it down to 10 cents.  Per a recent article (see link), "The two sides (India and Areva) have agreed on Rs 6 per unit, down from Rs 9.18 per unit quoted by the French company Areva initially, which was not acceptable to India."

In addition, France agreed to a very low loan interest rate to sweeten the deal: "France has also decided to provide India a loan for the project at 4.8 per cent interest rate for 25 years"  (same source from just above).  


No Other Countries Follow France
World Electricity Production in 2011
source: IEA Outlook 2013, slide 24

If the French model on nuclear was any good, why has no other country in the world adopted 80 percent power from nuclear?   No country follows France, with Ukraine next at only 46 percent, and South Korea at 29 percent of domestic electricity produced by nuclear power. (slide 17 from IEA see link).   In fact, world-wide, nuclear power produces just 11.7 percent of all electricity (2011 IEA above, slide 24).   If nuclear power was truly a better technology, one would expect that the past 50 years would have observed country after country abandoning coal and natural gas and building nothing but nuclear power plants.  Clearly, with only 11 percent or a bit more in world electricity share after 50 years, nuclear power is not the best choice.  

Conclusion

After the worldwide increases in crude oil price in the 1970s, France chose nuclear power rather than high-priced imported oil or relying on other countries for natural gas.  France has, in the intervening years, subsidized its power prices, reluctantly privatized a portion of the electric industry, developed nuclear technology that it desperately subsidizes to sell to other countries, exports low-balled subsidized power to neighboring countries in an attempt to maintain high nuclear plant operating rates, and recently was the object of an investigation for anti-trust by the EU related to power prices.  Clearly, following France in nuclear is not the way to go.


Previous articles in the Truth About Nuclear Power series are found at the following links.  Additional articles will be linked as they are published. 












Roger E. Sowell, Esq.
Marina del Rey, California