Saturday, April 15, 2017

NRC and DOE to Hold Third Advanced Reactor Workshop

Subtitle: With BWR and PWR Failures; Now Vendors Grasping Desperately

From the NRC news site for April, 2017, this item 17-016 (see link) is excerpted below   

"The Nuclear Regulatory Commission and Department of Energy are continuing their joint
workshop series on innovative reactor technologies, April 25-26, in Bethesda, Md.
“We are encouraging interested parties to continue discussing the most efficient and effective path forward to safely develop and deploy advanced reactors in the United States,” said Vonna Ordaz, acting director of the NRC’s Office of New Reactors. “We expect to discuss topics such as modeling and testing innovative technologies, as well as how vendors might approach getting their designs approved for U.S. use.”

"The NRC defines advanced reactors as those technologies using something other than water to cool the reactor core. The NRC is currently discussing one such advanced design with a vendor considering applying for design certification. The NRC remains available for early-stage discussion with other potential advanced reactor vendors." -- end excerpt

Sowell Comments

The NRC reviews and approves nuclear reactor designs only on the issue of safety; it does not concern itself with costs to design, to construct, to operate, to refuel, to repair, to perform maintenance, nor to decommission.  These advanced reactors, as NRC defines them, would include reactors that use things such as molten salts, liquid sodium, helium, and supercritical CO2 as the primary coolant.  

What is most interesting is the question: "Why even consider advanced reactors when existing nuclear power plant designs are supposedly the safest, most reliable, and cheapest form of electricity on the planet?"  That question is, of course, posed in jest by me but the claims are stated loudly and often by the nuclear proponents.   The facts are quite the opposite, as shown in the 30-article series on SLB "Truth About Nuclear Power."  (TANP)  see link

Just on the construction cost basis, nuclear power plants that use the PWR (pressurized water reactor) technology such as Westinghouse AP-1000 cost 9 to 10 times as much for the same output, compared to natural gas-fired CCGT (combined cycle gas turbine) plants. 

Operating costs on a $/MWh basis are also higher or about the same for PWR plants, when compared to the CCGT plants.  

Load-following is quite easy and very safe for CCGT plants, but a PWR nuclear reactor has great difficulty in adjusting load.  Operating at reduced rates to follow the load requires the nuclear plant to increase the sales price of electricity to obtain a constant revenue stream.  PWR plants are already too costly to operate, as evidenced by the many shutdowns in the US. Increased operating costs to load-follow make a bad situation even worse.  

Given all the above, and those points to not include any safety nor decommissioning costs, perhaps it is no wonder that nuclear designers are back at the drawing board, scratching out new designs in an attempt to overcome the failures of BWR and PWR reactors. 

Two of the new technologies are discussed in the TANP series, with thorium -powered molten salts, and gas-cooled high-temperature reactors in Articles 28 and 29, respectively. 

Perhaps this time, some creative nuclear designer will find a way to make nuclear power safe, cheap, and reliable.   It is instructive to remember that if all power plants were nuclear-powered, the changing loads on the grid require that the plants run at approximately 50 to 60 percent on an annual average basis.   Minimum loads occur at night in the Spring and Fall seasons, and typically reach approximately one-third to one-fourth of maximum or peak load.   Peak load typically occurs in mid-afternoon on a late Summer day.    However, some grids have peak loads in the Winter as heating demands are greatest.    These issues are discussed in some detail in Article 2 of TANP (see link)  

Roger E. Sowell, Esq.
Marina del Rey, California
copyright (c) 2017 by Roger Sowell - all rights reserved


Topics and general links:

Nuclear Power Plants.......here
Climate Change................here  and here
Fresh Water......................here
Engineering......................here  and here
Free Speech.................... here
Renewable Energy...........here 





Friday, January 1, 2016

Review of Activity - 2015

This is a place where a summary of the 2015 year's activity on SLB is shown.  

Total new articles - 38
Views of new articles - 3,390
Total views in 2015 - 35,700
Total blog views from inception to date (2008 - 2015) - 142,000
Total countries visited SLB to date - 147
Total articles published to date - 312

Views of 30-article Truth About Nuclear Power series - 11,051 views (in 2015 alone)
Total views to date for TANP series:  21,250

Most popular articles published in 2015 (most to least)
Thorium Nuclear Reactor Not the World Savior
The View from a Process Engineer
US In a Cooling trend, Winters Much Colder
Mars Colony -  Bad Idea
Australia Nuclear Prospects - Q13-17

My own views of which SLB articles from 2015 are the most important, due to their topic or significance that may, and very likely will, impact society:

1.  Coal Exhaustion Looms - Renewable Energy to the Rescue  (see link)
2.  Energy Supply in Post-Coal America  (see link)
3.  US In a Cooling Trend - Winters Much Colder  (see link)

"Coal Exhaustion Looms" describes the world running out of coal as fuel supply within 50 or 60 years, if present consumption continues.  The economic result is rather large, since approximately 45 to 50 percent of the world's electricity is provided by coal-burning power plants.  This relates to economically, proven recoverable reserves of fuel-grade coal worldwide.  There are approxmately 500 billion tons remaining, at a consumption of a bit more than 9 billion tons per year.  

Closely related to that, "Energy Supply in Post-Coal America" describes the even worse situation for domestic coal in the US, which will be exhausted in only 20 years (by 2035) at present consumption rates.   The article goes on to describe the apparent (or perhaps coincidental) marginalizing of the coal exhaustion problem and official promotion of the non-existent Global Warming from Fossil Fuels problem.   20 years is not very long in utility planning terms to replace almost 40 percent of the US grid's combined energy supply.  Natural gas-fired power plants, and wind turbine energy will be the technologies to supply the power.  

"US In a Cooling Trend - Winters Much Colder" is important because it shows the temperature trend from data from pristine locations that needs zero adjustments, unlike the official temperature data from NOAA.   The winters are cooling much faster than the annual average, at the rate of minus 10.9 degrees C per century.   Policy makers must be made aware of the cooling trend and make appropriate preparations for running the country successfully should this trend of only 10 years be shown to continue.  In short, stop the false-alarmism on Global Warming and began the serious business of life in a much colder, harsher world with far less agricultural output.  

Roger E. Sowell, Esq.
Marina del Rey, California
copyright (c) 2016 by Roger Sowell, all rights reserved




Sunday, August 23, 2015

Nuclear Plant News for August 23 2015

Subtitle: Plenty of News and All of it Bad

As readers of SLB will know, the Truth About Nuclear Power series of articles included statements that modern nuclear power plants cost far more than $4,000 per kW, also that nuclear power plants do not have a 60 year useful life, unplanned shutdowns occur frequently, and nuclear plants require massive subsidies.   Several articles in the press this past week provide yet more evidence to support the TANP articles.  (see link to the Truth About Nuclear Power articles).

First, the Chinese are building a nuclear plant in Pakistan for approximately $9,900 per kW.  The announced cost is likely too low, and the final cost will likely be several billion more than quoted.  

"KARACHI: Pakistan Prime Minister Nawaz Sharif today (20 August 2015) inaugurated construction work on a China-backed $10 billion nuclear power plant here.   The Karachi Nuclear Power Plant II (Kanupp II) with the capacity to produce 1,100 MW electricity is being built with the assistance of China."  -  see link

Second, a nuclear plant in Switzerland is the subject of calls to shut it down due to it being the oldest operating commercial nuclear plant in the world, and not designed for the earthquake risk in that location.   The plant has been operating for 46 years, many years short of 60 that nuclear advocates claim.    see link 

Third, yet another unplanned shutdown of a US nuclear plant occurred on Saturday, 22 August 2015 when the Pilgrim Nuclear Plant shut down without warning at around 4:30 pm local time.   see link 

Fourth and finally, Exelon continues to cry to the government for subsidies to keep its nuclear plants operating.   Once again, the Quad Cities nuclear plant could not win a bid to supply electricity to the grid.  It is a candidate for closure.  see link

Roger E. Sowell, Esq. 
Marina del Rey, California
copyright (c) 2015 by Roger Sowell, all rights reserved











Friday, June 19, 2015

The View from a Process Engineer

Subtitle: Seven Steps to Good Evaluation
by Roger Sowell [1]

This article delves into the world of one of the most practical of all engineering disciplines: the chemical process engineer.   I hope to explain how we process engineers do at least some of the things we do, and why.  The examples shown here may have applicability to those who read and write on subjects such as climate change, nuclear power, renewable energy, water shortages, and many others.   All of the just-mentioned subjects are found on SLB.  (see notes and references below)

First, what is a chemical process engineer?  As I am one (as well as being an attorney at law), I can say that it is a person with a degree in chemical engineering who practices his or her engineering skills in process plants.   Process plants encompass quite a variety of industrial plants, such as petroleum refineries, natural gas plants, petrochemical plants, basic chemical plants, air separation plants, synthetic fiber plants, agricultural chemical plants, agricultural or crops processing plants (i.e. corn refineries that produce ethanol), synthetic fertilizer plants, soaps and detergents plants, adhesives plants, and many more.  My own career to date has given me first-hand experience in many of those categories, including petroleum refineries (of four types), natural gas plants, petrochemical plants (of many types), basic chemical plants, and air separation plants. 

The process engineer (leaving off the word 'chemical') typically addresses a problem or considers a new idea via a seven-step process.  These are, in order, 
1) is it physically possible, 
2) can it be made safe, 
3) can it operate reliably over time, 
4) can environmental impacts be mitigated, including post-operating life cleanup, 
5) can it make a profit, 
6) can it compete for scarce capital resources, and 
7) is it the best among the available alternatives.

Each of these steps is discussed below.   It is important, to a process engineer, to take the steps in order and not skip any steps.  

Physically Possible

This step may appear unnecessary, even ridiculous, but it is amazing (to me) how many people (typically non-engineers) who believe in and then advocate for processes or an article (meaning a thing) that violates one or more of the laws of physics.  Consistency with the laws of physics is the meaning in this context of "physically possible."   One sometimes hears, for example, that "everything is possible."  That is just not true.    There are many, many laws of physics, chemistry, and thermodynamics, that are immutable.  As I mention in my speeches, no one has ever found a violation of the Second Law of Thermodynamics.  I encourage the students and practicing engineers at my lectures to notify me at once if and when they encounter a Second Law violation, because I want to congratulate them, and be the one that notifies the Nobel Prize committee on their behalf.    Once a potential idea, or problem solution, is examined and found not to violate any physical laws, and only then, does the process engineer move on to the next step. 

Can It Be Made Safe

Safety in a process plant is not only required by law, it is critical to success.  Success may be defined in many ways, but in this context it is sufficient to have success mean long-term profitability.   This ties in somewhat to the next step, reliable operation.  An unsafe plant typically has unexpected production disruptions, perhaps explosions and fires, process areas that will not function, injured or killed employees, and a host of other undesirable outcomes.   

The process engineer examines the potential idea and evaluates the safety aspects.  There may be, for example, high temperatures, high pressures, corrosive or abrasive materials, toxic gases or vapors, and unstable chemicals that could violently expand, explode, or spontaneously ignite.  Other dangers could include very low temperatures, a tendency to solidify and block the flow, or emissions of dangerous radiation.  This is only a partial listing of the many and varied dangers that exist in a process plant.  There may be design or operating decisions that can eliminate the safety concerns, or mitigate them sufficiently to move on to the next step.   If the safety concerns cannot be overcome, the process engineer stops the evaluation. 


Reliable Operation Over Time

A process plant must operate reliably over time to be useful and profitable.  The question is how to define "reliable."   Process engineers usually define reliability by a percentage of time that a plant operates.  Operating ninety percent of the time is a typically acceptable reliability.  A process plant typically must be shut down at intervals to allow equipment to be repaired, cleaned, or have other services performed.   Plants that operate with frequent but unplanned shutdowns have a low reliability and will suffer a reduced profitability.  Profits are decreased as production decreases, from increased cost of repairs, and sometimes from re-processing unsuitable production.   A process can have multiple negative impacts where unreliable operations combine with unsafe conditions, as above.  Only where an idea can be designed and operated with sufficient reliability does the process engineer move to the next step. 

Environmental Impacts Mitigated    

A modern process plant must meet certain environmental requirements as defined in a multitude of laws.  An idea for a new process must be evaluated for environmental impacts.  There are at least three ways to eliminate or mitigate environmental impacts, including capturing and properly disposing the pollutants, dispersing the pollutants so that any toxicity is reduced or eliminated, and designing the process so that the pollutants are not produced at all.  This last means is sometimes known as "green chemistry."  

The process engineer examines the various regulated pollutants and evaluates the available means to meet the emissions requirements.   The concept of Best Available Control Technology, or BACT, is common in the environmental world.   As examples of "capture and dispose", toxic dusts may be captured in a filtering system, gaseous pollutants may be physically absorbed or chemically converted to benign chemicals, and liquids that have objectionable acidity or alkalinity (low or high pH) can be neutralized.  

Dispersing pollutants is generally a last resort, but such systems are occasionally allowed.  Examples include saline brine from desalination plants where the saline brine is introduced gradually and at multiple points into the ocean, treated water from a waste-treatment plant is also introduced slowly and over a wide area into a body of water (the Pacific Ocean receives treated water from a large waste treatment plant on the coast near Los Angeles, California), and tall smokestacks are required to allow the wind to disperse emissions. 

Environmental impacts must include mitigating any impacts when a process plant is shutdown after its viable life expires.  The US history is replete with hundreds of petroleum refineries and various chemical plants that have shut down permanently.  Many of those sites required extensive and costly mitigation to clean the soil.  Other process plants may have toxic areas that require special remediation.  

Only where the process engineer can determine acceptable ways to design and operate a plant that meets all the environmental requirements does the next step occur.     

Operate Profitably

The goal of (almost) every process plant is to make a profit, and a process engineer evaluates each idea with that in mind.  Where the idea is physically possible, can be made adequately safe and reliable, and meets environmental requirements, the process engineer examines the potential profitability.  This almost always includes an evaluation of capital costs, operating costs, and expected revenues.    Importantly, an idea that requires a lengthy construction period will also incur substantial financing costs.  

Many economic aspects of a new idea will be evaluated, including considering various sizes to take advantage of economy of scale, possibly modularized construction, competing technologies (if any exist), fees or royalties, plant location with respect to feedstocks and markets, plus many more.  It may be possible to improve profit for plants that have high electrical power requirements when they can be located near sources of low-cost electricity, such as hydroelectric dams.   

A key aspect is the cost to achieve improved reliability, especially long-term reliability due to corrosion.  Process engineers understand that corrosion is a function of the material chosen for the various pipes and equipment (note, there are also many other aspects that impact corrosion).  It may be possible to build a plant that does not corrode, if one had unlimited money and constructed the plant with titanium.  At the other extreme, one could build a plant of carbon steel and replace the various equipment and pipes just before the corrosion renders them unsafe and unreliable. 

The process engineer evaluates all the above, and many others, to determine the likely profitability of the new idea.   Several measures of profitability are usually calculated, with one of the most commonly used being the simple payout time.  A process engineer simply divides the capital cost by the annual net income (revenues minus operating costs) to obtain the number of years that would be required to pay off the capital cost.  For example, a new idea that would cost $10 million to install, and has $2 million per year net income would have a 5 year payout.   

Only where the simple payout time is sufficiently small, perhaps 2 or 3 years, does the process engineer move on to more sophisticated calculations of profitability. 

Compete for Scarce Capital Resources

Next, a new idea is evaluated against other potential ideas or projects.  It is common that only a finite capital budget exists, but the combined cost of the numerous ideas greatly exceeds the capital available.  The process engineer then must evaluate the various new ideas and select those for implementation.   The selection criteria and process may be complicated and require careful evaluation from many people in the organization.  

One criterion that a process engineer uses is the simple payout time from above.   Projects with shorter payout times almost always win over those with longer payout times.   


Best Among the Available Alternatives

The final step taken by the process engineer may appear to be identical, or similar, to the Compete for Scarce Capital Resources step just above.   However, in this context, the process engineer considers the overall wisdom of proceeding with the new idea.  Even if the new idea could be built according to all the above criteria (physically possible, safe, reliable, environmentally adequate, profitable, and more profitable than competing ideas), the process engineer considers whether the new idea should be built.   

There may be compelling reasons one might not want to build the new idea.  Perhaps the new idea consumes resources that could be used in a different way or for a different purpose.  Natural gas, for example, has been decried as a heating fuel and as a power generation fuel because it has great value as a building block for pharmaceuticals, agricultural chemicals, and synthetic fertilizer.   Coal as a resource is also limited to approximately 50 years at this time, with its primary use as power generation fuel.[2]   It might be wise to reduce coal use as a power plant fuel and use it instead as a petrochemical precursor.  

Another aspect is anticipated government regulation that would cut short the operating life of a new process plant or idea, such as occurred with mercury-based chlorine plants, plants that produced certain refrigerants, plants that produce lead-containing products, and plants that produce asbestos-containing products.   

Application to Other Areas

The above discussion shows seven steps employed by process engineers.   These steps are proven over many decades.  But, are they applicable to non-process plants?  The list at the beginning included climate change, nuclear power, renewable energy, and water shortages.   Each is discussed below.  

  -- Climate Change

In climate change, the science is so shaky, so uncertain that it scarcely deserves consideration. [3] [4] (see link and this link).   When one considers how the climate data was and still is tortured, how definitive statements of man-made climate change are made - and then revised - and then revised again and again, how modern instruments with global reach show zero warming for almost two decades, how the best "climate models" disagree with modern temperatures, it is a wonder that climate change is considered a problem in the first place.   Yet, solutions to any actual global warming, and more importantly, global cooling, can be addressed via the above seven steps.  One must, first, reliably identify whatever is a substantial factor in causing global warming - or cooling.   To date, global warming advocates believe that increased carbon dioxide in the atmosphere is causing unstoppable global warming.  There is no evidence to support that belief, however.   

If, and this is a big IF, it becomes necessary to reduce carbon dioxide inputs into the atmosphere, or remove some from the atmosphere, chemical engineers already know that it is physically possible to do so.  Safety is a major concern, especially for the processes that capture carbon dioxide and store it in liquid form deep in the earth.  A leak of liquid carbon dioxide into the atmosphere could and likely would suffocate thousands, if not millions of people.   Process plants that remove carbon dioxide from furnace exhaust stacks have existed for many years, and a modern plant is now running near San Antonio, Texas.   Reliability is not a major issue for these plants.  Environmental compliance is also not an issue, other than the massive leak from storage described above.  However, the cost to build and operate is a problem at this time.   The major issue, though, is whether the great cost to build enough plants to make a difference is justified, considering the questionable science surrounding the entire climate change and human contribution to any historical warming.  

   -- Nuclear Power 

Nuclear power is a frequent topic on SLB, and creates great disagreement and acrimony between proponents and opponents.   As readers of SLB already know, my position is a nuclear opponent.  The 30-article series on the Truth About Nuclear Power shows many excellent reasons why nuclear power plants should never be built. [5] (see link)

Yet, nuclear proponents continue with their beliefs that nuclear power is safe, affordable, and desirable.   Nuclear power can be considered as two categories: proven and unproven technologies.  As proven technologies, there are boiling water reactors and pressurized water reactors (BWR and PWR, respectively).  Unproven technologies include thorium, fusion, high temperature gas reactors, and small modular reactors.   

The arguments made by proponents for expansion of PWRs is that newer models are less costly and safer.  Some even argue for relaxed regulations, and abolition of lawsuits during construction.  Applying the seven steps, it is seen that the reactors are physically possible, but clearly not safe and not very reliable - especially as the plants age.  Environmental risks and damage are very great, with highly toxic nuclear waste emitting dangerous radioactivity for hundreds and thousands of years.  Costs to build have not been reduced but instead keep increasing, even though huge plants are built to achieve economy of scale.   Finally, competing technologies for producing electrical power make nuclear plants not the best choice, including natural gas and renewable energy.   

Unproven technologies barely pass the physically possible test, with fusion as yet only a theoretical but not demonstrated concept.[6]  Thorium plants also are physically possible but have major safety, reliability, cost and environmental concerns.[7]  The same is true for high temperature gas reactors [8] and small modular reactors.[9]  A major concern for thorium-based nuclear plants is the corrosion and cracking in the metallurgy that contacts the molten salt.  Every heat exchanger with tubes will eventually leak, with material at higher pressure leaking into the material with lower pressure.  The consequences of such leaks must be understood.   It is astonishing to me that a great number of nuclear proponents simply ignore this basic fact of process engineering.  

The final verdict on nuclear power is that proven technologies are vastly uneconomic, require massive government subsidies, and leave behind highly toxic wastes that endure for generations.  Unproven technologies are even worse.  

   --  Renewable Energy 

The renewable energy subject includes many technologies, solar in its various forms (photo-voltaic, concentrated solar, and solar ponds), wind both on-land and off-shore, ocean including waves, tides, sea-surface vs deep ocean temperature difference, and currents, river flow systems, pressure retarded osmosis at river mouths, [10] and bio-mass systems including land-fill methane capture, municipal solid waste burning, and water distribution pressure recapture.  Many of the above technologies require some form of energy storage and release to provide increased value to the untimely or intermittent nature of the energy source.  [11]

Physical possibility exists for all of the above renewable technologies.  Safety is adequate or can be made acceptable.  Reliability can also be made acceptable with sufficient design and investment.  Costs are rapidly declining in most technologies as experience is gained and economies of scale are captured.  Economy of scale exists for both larger individual units, and for mass production, and for single-events such as building transmission lines.    The lack of environmental impact, or very low impact, makes renewables especially attractive.  The eternal nature of the motive force, the sun, the wind, ocean waves, tides, and currents, and the essentially eternal production of municipal solid waste also make renewables especially attractive.  As installed costs continue to fall but costs of other forms of electric power increase, renewable energy plants become ever-more attractive.  

    -- Water Shortages

Fresh water in adequate amounts is a greater and greater concern, even though some areas experience heavy rains and floods.  Providing adequate fresh water essentially reduces to three technologies: building dams and storage reservoirs to hold and retain water during abundant years; desalinating ocean waters; and collecting then transferring excess water from areas of abundance to areas of scarcity.  Those in the water industry also promote conservation, however that has a very limited benefit.   Pumping groundwater from aquifers to the surface is also common in many areas, however the aquifers are generally not replenished as rapidly as the water is pumped out.   Yet another (unpopular) technology is simply recycling treated water from waste treatment plants.   This last has the great risk of transmitting disease via unclean water.  

Technologies exist and are therefore physically possible for each of the three technologies (dams, desalination, and water transfer).  (for water transfer, [12] see link) The technologies are safe and reliable when properly designed, built, and operated.  Certain dams have failed with harmful or even catastrophic results, but those can be minimized or eliminated with proper attention.  Environmental impacts are hotly debated, with some claiming great harm results from building dams and desalination plants.  

The major issue with fresh water is cost, and in some cases, ownership of the plants.  Water is such a vital part of life that many consider it too precious to be privatized except in very limited and controlled ways.  However, some technologies are simply very costly at this time, especially desalination via reverse osmosis, RO, the most attractive process.  A few thermal desalination technologies also exist, but are generally less economic than electrically-powered RO.  

Conclusion

The seven steps of process engineers, physically possible, safety, reliability, environmental impact, profitability, most economic choice, and wisest choice, are used to evaluate a new idea or process plant.  These steps should be used to evaluate other areas to provide a systematic and grounded conclusion.  Having a blind and irrational faith in future innovations is not a good basis for allocating resources of time, talent, and money.  Yet, a blind and irrational faith is what many people exhibit in their writings on many topics (especially climate change, and nuclear power).  

At the same time, many people have far too little understanding of the technical and economic advances in renewable energy systems, and the associated energy storage and release systems.  

Roger E. Sowell, Esq.
Marina del Rey, California
copyright (c) 2015 by Roger Sowell

Notes and references:  (notes and references added 4-16-2016)

[1] Roger E. Sowell, B.S. 1977 in chemical engineering from The University of Texas at Austin, has worked as a Principal Process Engineer and consultant for 40-plus years in and with more than 75 oil refineries and petrochemical plants in a dozen countries on five continents.  Clients include major and independent oil and gas companies, world-scale petrochemical companies, and basic chemical companies.  Process plant assets ranged from the $100 million range, to $10 billion and higher.  He has performed hundreds of process studies in process design, operations, optimization, and economics.   Implemented projects have a cumulative value of the low hundreds of million dollars, and cumulative benefits exceeding $1.3 billion.  He is published in Hydrocarbon Processing and CryoGas International.  He has also taught engineering students at University of California at Los Angeles, University of California at Irvine, and made dozens of public speeches.  He is also a Council Member with Gerson Lehrman Group, providing expert advice to member clients.  He is also a California attorney-at-law, in Science and Technology Law, and publishes SowellsLawBlog.   He was recently (2016) requested to defend climate skeptics in United States RICO actions.   He is a founding member of Chemical Engineers for Climate Realism, a Southern California think-tank comprised of experienced chemical engineers. 

[2] CalTech Professor David Rutledge,  "Estimating long-term world coal production with logit and probit transforms,"  International Journal of Coal Geology, 85 (2011) 23-33,  http://rutledge.caltech.edu/  -- discusses world coal deposits and economically recoverable coal. 

[3] Sowell, R.  “Warmists are Wrong, Cooling Is Coming” see link 

[4] Sowell, R.  “From Man-made Global Warmist to Skeptic – My Journey” this link.  

[5] Abbot, D. "Is Nuclear Power Globally Scalable?" Proceedings of the IEEE, Vol. 99, No. 10, pp. 1611–1617, 2011,  see link)  also Sowell, R.  “Truth About Nuclear Power – Conclusion” (see link),  -- Abbot discusses 15 reasons that nuclear fission power is not viable in the long term.  

[6] Lawrence Livermore National Laboratory LIFE,  Laser Inertial Fusion Energy.  See link, also  Sowell, R.  “Power from Nuclear Fusion”,   see link  -- Sowell's summary of the LIFE process: Fusion is proceeding in research but has so many drawbacks it is almost a tragedy.  LLNL plan to split water into hydrogen and oxygen, isolate deuterium from normal hydrogen, freeze the deuterium, make spherical pellets of the deuterium, then load the sphere into a special chamber where high-powered lasers blast simultaneously on the sphere’s surface to induce a fusion reaction at the sphere’s core.    If it were not published by a US national lab, this would be the stuff of comic books and a mad scientist. 

[7] Idaho National Laboratory, “Molten Salt Reactor,” see link  also Sowell, R.  “Thorium MSR No Better Than Uranium Process”   see link 

[8] Nuclear Regulatory Commission, “HIGH TEMPERATURE GAS-COOLED REACTOR (HTGR) NRC RESEARCH PLAN” (2011)   see link  also Sowell, R.  “High Temperature Gas Reactor Still A Dream,” see link

[9] World Nuclear News, 2014, “Funding for mPower Reduced,” see link also Sowell, R.  “No Benefits From Smaller Modular Nuclear Plants,” see link

[10] US utility patent 3,906,250, also  Sowell, R.  “Renewable Energy from River Mouth Osmosis,”  see link

[11] “Nobel Prize in Chemistry, 2000: Conductive Polymers” see link,  also Sowell, R. “This Battery Is A Game Changer,”  this link  -- BioSolar's novel battery with halogenated polyactylene cathode is to provide double the kWh capacity, less weight, fast charging, and at one-fourth the cost of commercial batteries used in the Tesla all-electric cars.  Other uses include grid-scale electricity storage at affordable cost.  


[12]  Cohen, Lorraine Y. “Mid-west floodwaters, an ignored national resource,” see link, also   Sowell, R.  “Solution for Water in the West – NEWTAP,” see link  -- Sowell's concept for a national water transfer system, pipeline or canal, is described to economically transfer excess water from the Missouri River to Arizona's Colorado River. 




Sunday, August 3, 2014

The Truth About Nuclear Power – Part 30

Subtitle: Conclusion on Nuclear Power Not Economic Nor Safe

This is the 30th and final chapter in the Truth About Nuclear Power series, (see links at end of article) at least for now.  The TANP series was motivated by many conversations and digital exchanges via emails and online blogs over several years, in which most nuclear advocates advanced various statements about the advantages of nuclear power.  Knowing that those statements were false, I answered many of the false statements.  

For those who have read some of or the entire TANP series, this concluding article will serve as a review and provide (hopefully) further insight into the actual world of nuclear power.  The article is in three parts: 1) the rosy claims of nuclear advocates, 2) questions raised by those rosy claims, and responses to the questions raised, and 3) an answer for why nations continue to build nuclear plants despite the serious and numerous disadvantages.  

Part I of this article discusses nuclear advocates’ six primary claims, those being that nuclear power is 1) cheap,  only 2 or 3 cents per kWh,  2) reliable, and 3) extremely safe; they insist that 4) the plants run for 60 years before needing replacement, and 5) cost only $2.5 to $4 billion per 1,000 MW plant.  They also insist 6) the plants are built in only 4 years from groundbreaking to startup.   None of that squares with what I know about nuclear plants.

Part II of this article addresses a series of questions about nuclear power, the answers to which led to many of the previous articles on TANP.  The general form of the questions is, If what nuclear advocates say is really true, then Why (insert the question) is this also true?  These questions are shown below:

1 Why has nuclear power achieved only 11 percent of world power production, after more than 5 decades of competition?
2  Why do small islands have zero nuclear power plants, but burn expensive oil or diesel resulting in power prices of 25 to 35 cents per kWh?
3 Why do nuclear utilities never, ever, ask for a rate decrease when they build a nuclear plant?
4  Why did France install nuclear plants to provide 85 percent of the country’s power, and no other country in the world followed their lead?
5  Why does France have higher electricity prices than does the US, even with France heavily subsidizing their electricity industry?
6  Why does nuclear power in the US require heavy subsidies from government – and almost total indemnity from costs of a massive radiation disaster?
7  Why are nuclear plants shutting down in the US, with owners saying they are losing money?
8  Why are there so many near-misses on meltdowns in US plants, every 3 weeks? 
9  Why were there three serious meltdowns worldwide in just a bit more than 30 years? (Fukushima, Chernobyl, Three Mile Island)
10  Why are new reactor technologies being researched and developed?

Part III of this article poses, then answers, the additional question of Why do countries around the world continue to build nuclear power plants, in spite of all the obvious, documented, irrefutable disadvantages of nuclear power?

I    Rosy Claims of Nuclear Advocates

Nuclear advocates assert six primary claims, those being that nuclear power is 1) cheap,  only 2 or 3 cents per kWh,  2) reliable, 3) extremely safe; they insist that 4) the plants run for 60 years before needing replacement, and 5) cost only $2.5 to $4 billion per 1,000 MW plant.  They also insist 6) the plants are built in only 4 years from groundbreaking to startup.   None of that squares with what I know about nuclear plants.

The reality is quite different.  Taking their assertions in turn, nuclear power is cheap only if one counts the fuel costs but ignores all the capital costs, operations and maintenance, insurance, taxes, and other costs of owning and running a plant.   There is a fundamental fact that energy from nuclear fission is quite large, given the amount of uranium that is split into smaller atoms.   However, no one prices a product simply on the fuel costs – for example, renting a moving van typically has a fixed cost per day plus a cost for miles driven, plus costs of insurance, plus the renter must pay for fuel used.   As another example, renting a home or apartment typically includes a fixed cost per month for use of the home, plus costs for utilities including electricity, natural gas, water, trash removal, communications (phone service and internet service), and insurance.  It is misleading and deceptive for nuclear advocates to claim that nuclear power is cheap, based solely on fuel costs.

Next, nuclear plants are claimed to be reliable.  At times, they are reliable – but only when they are running.  TANP Part 16 shows that in the US, nuclear plants were shut down on an emergency basis approximately once every 3 weeks over a four-year period.   Those incidents were serious, so much so that the NRC sent an investigative team to those plants.   There were actually far more unplanned shutdowns, each of which shows the plants are not as reliable as advocates claim.   The NRC, for safety reasons, requires nuclear plants to shut down for many reasons until the safety issue is resolved.   The plants also experience routine equipment failures, both on the nuclear and non-nuclear sides of the plant.    When the nuclear plant trips off-line, the other power plants on the local grid must make up the loss of power, or the electrical demand must be reduced.   A very recent example of loss of nuclear power is the total and permanent shutdown of the San Onofre Nuclear Generating Station (SONGS) in Southern California in 2012.   The plant was shut down without warning due to a serious radioactive steam leak into the atmosphere.  This was discussed in TANP Part 23.   The twin reactors were producing approximately 2100 MW into the grid.  All that power had to be replaced quite suddenly.

Next, nuclear plants are claimed to be extremely safe.  Several articles on TANP address the safety issues, including Part 16 mentioned just above, showing the plants shut down approximately every 3 weeks in the US to prevent a serious malfunction.   The three major meltdowns, Three Mile Island, Chernobyl, and Fukushima Dai-Ichi were discussed in one article each on TANP.  Evacuation plans required at each plant are discussed in Part 26.   The fundamentally unsafe nature of nuclear plants, and the incredibly high risk and consequent damages from a major incident are discussed in several articles, including Part 5, and 6.   Medical risks to populations are discussed in Part 19.  Reprocessing spent fuel and the safety issues associated are discussed in Part 18.   An example is described in Part 16, where  the short-lived Rancho Seco nuclear plant near Sacramento, California, was shut down permanently after only 18 years of operation (1971 - 1989) due to an incredible number of leaks, radiation emissions, fires, mechanical breakdowns, and other safety issues.

Next, nuclear plants are claimed to run for 60 years before replacement.  This assertion is simply not true; the Rancho Seco plant mentioned just above lasted only 18 years, while the two reactors at SONGS plant lasted just under 30 years.   The Three Mile Island Reactor 2 melted down after only one year of operation.  Per the NRC, at this time the oldest US operating reactors are 44 years old.   Of the 28 shutdown nuclear reactors in the US, none made it to 60 years before shutdown. 

Next, nuclear plants are claimed to cost only $2.5 to $4 billion per 1,000 MWe output.  This is again a similar misstatement, in that it incorporates only the theoretical cost, the “overnight” cost and does not include the realities of a multi-year construction period, cost escalations due to inflation on materials and labor, and the interest on construction loan.  As shown in Part 3, 6, and 9, the actual cost to construct a modern nuclear power plant is approximately $10 billion for a 1,000 MWe output. 

Finally, advocates claim that nuclear plants are built in only 4 years from groundbreaking to startup.  The reality is that almost every nuclear power plant requires far more than 4 years, with many requiring 10 years or longer to build.  Even today, a new reactor in Finland and a similar one in France are years behind schedule, the Vogtle plant in  Georgia (US) is also years behind schedule.  The South Texas plant was several years behind schedule when it started operating.   Watts Bar unit 1 required 23 years from start to completion. 

II A Series of Questions

Ten questions came to mind in response to the nuclear advocates’ position on nuclear power, which are discussed in turn below.  From above, the general form of each question is, If what nuclear advocates say is really true, then Why (insert the question) is this also true?  These questions are shown and discussed below.

1 Why has nuclear power achieved only 11 percent of world power production, after more than 5 decades of competition?

The reality is that, even after 50 years or more of design, development, actual experience, fine-tuning, and making best efforts around the world, nuclear power (as of 2011 per EIA statistics, see TANP part 11) provides only 11.7 percent of all power world-wide.   The only technologies smaller than nuclear’s share are oil (4.8 percent) and a catch-all category (4.5 percent) that includes wind, solar, geothermal, and various other renewable power.   One would expect that nuclear, if it were truly a superior technology economically and safe, would have easily surpassed coal, natural gas, and hydroelectric power (41, 22, and 16 percent approximately, respectively).  Nuclear power, in the US and in the early 70’s, was seen as a cheap way to replace oil-fired power plants that were suddenly losing money after world oil prices increased in the Oil Embargo.  Until that time, oil provided about 20 percent of US power.  Nuclear plants replaced that oil-based power almost on a one-for-one basis.  However, when nuclear plants had to compete with lower-cost technologies, coal and natural gas, they could not. 

2  Why do small islands have zero nuclear power plants, but burn expensive oil or diesel resulting in power prices of 25 to 35 cents per kWh?

This is discussed at length in TANP part 12.   It is quite instructive that islands around the world, particularly those 15 islands with populations that support a power demand of approximately 1000 MW, have zero nuclear power plants.  If nuclear power was truly as cheap as the advocates claim, then why are islanders burning fuel oil and diesel in generators to produce power that costs them 25 to 35 cents per kWh (or more)?  Surely, the islanders are not stupid.  The simple fact is that islanders are quite smart, and are using the best technology available to provide power at the lowest cost consistent with reliability and safety.   Nuclear advocates seethe over this point, and sneeringly reply that England must not be an island, then, nor Taiwan, nor Japan (several islands actually), since they all have nuclear power plants.  However, the point is that small islands, those with populations of approximately 1 million, have expensive power but zero nuclear plants. 

3 Why do nuclear utilities never, ever, ask for a rate decrease when they build a nuclear plant?

If nuclear power truly was as low-cost as the advocates claim, why then do utilities always request a rate increase when building a nuclear plant?   In all my research over many decades, I have yet to find a single utility that asked for a rate decrease after building a nuclear plant.  Indeed, today in Georgia (US), the utility had to request the legislature and Governor to change the law so that the utility could charge existing customers more money in order to build the Vogtle nuclear plant.   The utilities have gone from asking for money after the plant is built, to asking for money during construction.    At times, utilities have asked for so much money in the rate increase that lawsuits were required to settle how much of the cost to build nuclear could be obtained from the customers, and how much the utility had to absorb.   

The natural consequences of building nuclear plants is higher and higher power prices.  Grim consequences of this are discussed at length in TANP part 2. 

4  Why did France install nuclear plants to provide 85 percent of the country’s power, but no other country in the world followed their lead?

This fact, France having 85 percent nuclear power on their grid, is frequently thrown out by nuclear advocates to show that nuclear power is the best power choice, and that other countries would do well to follow France’s lead.  The reality is quite different.  This is discussed at length in TANP part 11.   France has few fossil fuel resources (at least up until now when natural gas is widely available but un-tapped via hydraulic fracturing and directional drilling).  Power before 1974 was provided by oil-burning power plants, using imported oil.  The OPEC oil embargo raised oil prices so much that France chose to build nuclear plants rather than import oil.  This is a theme that will be considered in greater detail in Part III of this concluding article.   

5  Why does France have higher electricity prices than does the US, even with France heavily subsidizing their electricity industry?

As shown in part 11, France had to subsidize its power industry, and must to this day sell excess power at night to other countries (primarily Italy) to avoid reducing the nuclear plants’ output each night and increasing again each day.   Only with the Italians’ cooperation is this possible.   France has also been found in violation of illegally subsidizing its power prices.   Finally, even with vast subsidies, France charges its customers between 50 percent and 100 percent more (essentially double) for electric power compared to prices in the US.  This is hardly a roadmap for anyone else to follow.  Indeed, no other country follows France in building so great a share of nuclear power on its grid.   After 40 years from the Oil Embargo, if it were a good idea, surely some other country would have done so. 

6  Why does nuclear power in the US require heavy subsidies from government – and almost total indemnity from costs of a massive radiation disaster?

As shown in great detail in part 13 and 25, US nuclear power plants enjoy massive subsidies.  In fact, no nuclear plant would be built without the subsidies.  Forms of subsidy include construction loan guarantees, liability relief from property and human injuries due to radiation disasters, relief from some construction lawsuits, a form of a carbon tax that shuts down their coal-based competition, and as mentioned earlier, legislation to force rate-payers to pay for nuclear power plant construction before the plants are completed.    In fact, the Price-Anderson Act provides that nuclear plant owners carry insurance for $300 million in damages, and each operating plant must contribute to anything above $300 million.  The federal government pays anything above a stated amount, presently about $10 billion.  In effect, the nuclear power plant owners have almost zero liability due to insurance and government indemnity.   This cannot be conducive to a safe operating regime – if there are zero consequences, why try to operate safely?

7  Why are nuclear plants shutting down in the US, with owners saying they are losing money?

As shown in TANP part 1, almost a dozen US nuclear power plants have either announced their intention to shut down, or are losing money while operating.  Nuclear utilities are pleading with lawmakers to pass laws to provide government subsidies to the nuclear plants.   This is due to the fact that nuclear power is not the most economic choice for power generation.  In fact, it is a losing proposition.  Nuclear power plants almost always run at 100 percent output or close to that, meaning they do not reduce output at night when demand for power is lowest.  Their cash operating costs, for items such as labor, fuel, and consumables like water and chemicals, are higher than the price the grid operator will pay them.   The fact that they do not reduce output at night forces them to compete with themselves, putting an unwanted and un-needed product into the market, driving down the prices.  Exelon, the owner of more US reactors (23) than any other company, has publicly sought government intervention to prop up its sales prices – in an effort to “save jobs.” 

8  Why are there so many near-misses on meltdowns in US plants, every 3 weeks? 

The nuclear industry, and nuclear advocates, try to avoid discussing the serious and frequent near-misses in the US nuclear reactor fleet.  However, the information is publicly available and is compiled and published annually.  The results for the four years 2010-2013, inclusive, are discussed in part 16.  There were 70 serious incidents in the four years, for an average of approximately one every 3 weeks.  There were many more incidents but these 70 resulted in an investigative team sent to the plant by the NRC.    Nuclear power plants are a tragedy waiting to happen.   From design issues that are only now discovered (many 40 years after startup), to replacement parts that do not work smoothly with the other plant systems, to untrained operators, to normal equipment failures responded to badly, to unanticipated combination of system failures, the list of causal events goes on and on. 

The most serious incident, in my view, occurred at the Byron Station, Unit 2, in January, 2012, in Illinois.  A complete loss of cooling water at Unit 2 was temporarily replaced with water from Unit 1. Had this been a single-reactor plant, with no operating reactor close at hand, the loss of cooling could have resulted in a partial or full core meltdown, exactly what happened at Fukushima, Japan, and at Three Mile Island.  This is completely unacceptable.

Nuclear advocates, though, argue that the safety systems are adequate since no meltdowns occurred recently.  However, the sheer number of serious incidents shows that eventually, another catastrophe will occur.  The US has been lucky, but that luck is likely running out as the plants grow older and more mishaps occur.

9  Why were there three serious meltdowns worldwide in just a bit more than 30 years? (Fukushima, Chernobyl, Three Mile Island)

This question is about the most serious disasters thus far.  Each is well-known, and has been in the world news.  Each meltdown has its own article in TANP, Three Mile Island is article 21, Chernobyl is article 20, and Fukushima is article 22.   In spite of the claims to safety, Three Mile Island resulted in a core meltdown that almost broke through the reactor walls.  That would most assuredly resulted in a hydrogen explosion and containment building destruction – with radiation spread over a wide area near the northern US East Coast.  Only pure dumb luck prompted an operator to re-start a water pump that had been deliberately shut down earlier.   That additional water began cooling the melting core.   Chernobyl’s explosion was the result of a badly planned and executed test with the reactor far from acceptable conditions.   The Fukushima multiple reactor meltdowns and containment building explosions were due to total loss of all grid power for days and days, following an earthquake that slightly exceeded design conditions plus a tsunami that far exceeded design conditions.   Each time a major incident occurs such as those three, the industry shrugs it off with sayings such as
“that was a coincidence,” or “that can never happen again” or something similar.   Yet, the stark fact is that in just over 30 years, there have been 3 major meltdowns, (five if Fukushima’s 3 reactors are counted separately), with 4 exploded containment buildings. 

10  Why are new reactor technologies being researched and developed?

This ties in with the earlier questions on nuclear economics, and to an extent, reactor safety.  If present nuclear technology was truly cheap, and truly safe, there would be no need to explore alternatives.  Yet, several countries are developing technologies including small modular reactors (SMR), fusion, thorium molten salt reactors, and high temperature gas reactors.  Each of these has an article on TANP, (8, 27, 28, and 29 respectively).   The conclusion for each technology is that the economics are even worse than present large-scale PWR (pressurized water reactor) designs, and each has serious safety issues.   The SMR companies in the US have recently curtailed their activities due to lack of investment and lack of customers.  The market-place has voted with its pocketbook, and the vote was “no sale.”   Fusion is proceeding in research but has so many drawbacks it is almost a tragedy.  They plan to split water into hydrogen and oxygen, isolate deuterium from normal hydrogen, freeze the deuterium, make spherical pellets of the deuterium, then load the sphere into a special chamber where high-powered lasers blast simultaneously on the sphere’s surface to induce a fusion reaction at the sphere’s core.    If it were not published by a US national lab, this would be the stuff of comic books and a mad scientist.   Thorium in a molten salt has so many technical and safety issues it will likely never be approved by a regulatory agency.  The same is true with HTGR, where uranium is enclosed in 2.5-inch spheres that are to be injected via a lock-hopper into a hot nuclear reactor at 1000 psi and more than 1000 degrees F. 

III Why Countries Continue to Build Nuclear Power Plants

Many more nuclear plants are under construction, or planned, in spite of all the obvious, documented, irrefutable disadvantages of nuclear power.   Most are not in the US, instead they are in many other countries including China, India, Finland, France, and others.   It is helpful to examine the alternatives for generating power in various countries.

First, the US has perhaps the lowest cost of natural gas of any major economy due to extensive directional drilling and hydraulic fracturing of gas-bearing strata deep underground.  Most other countries pay a price for natural gas that is on parity with the fuel-equivalent value of oil.  In today’s dollars, oil is approximately $100 per barrel, the equivalent of $17 per million Btu.   Natural gas in the US is presently $3 to $4 per million Btu, while in other countries it is $15 to $17 per million Btu.   A recent and major supply contract from Russia to China has the price of gas tied to the price of oil; as oil price increases, so does natural gas.  

Even with a high-efficiency natural gas power plant that uses combined cycle technology, the fuel component of power is approximately one-half the price of the natural gas.  Therefore, with gas at $17 per million Btu, power must be sold for at least $90 per MWh (9 cents US per kWh).   Capital costs and other operating, maintenance and miscellaneous costs add another $20 to $30, with the resulting price to the grid of $110 to $120 per MWh.  This price is what a nuclear plant must compete with, in non-US countries. 

Indeed, it is instructive that recent projects for nuclear power plants have a sales price for power of almost exactly as shown above.  India, for example, obtained a price of $100 per MWh in negotiations with France-based Areva where Areva wanted $160 per MWh.    That same project has a sweetheart interest rate of 4.8 percent from France to India for the construction loan.   Russia also sweetens nuclear plant deals with below-bank financing.  

Countries also are not pleased with natural gas imports, especially when the gas supplier has a tendency to shut off the gas supplies.  Russia has done this to its gas customers.   Perhaps it is better, the thinking goes, to have nuclear plants provide the power and not risk having the gas shut off in a cold winter.

It is also a consideration that balance of trade, the high cost of importing vast quantities of oil or natural gas, can have an effect on a national economy.  That is the reason France has advanced for switching to nuclear in the 1970s. 

Finally, it may be that different countries evaluate the safety risk and conclude that nuclear plants are sufficiently safe, given proper design and when located away from earthquake zones and tsunami areas. 

Conclusion

Finally, it has been shown throughout the TANP series that nuclear power is not economic – many citations are documented.  Nuclear power is not safe either – again many citations are documented.  Despite this, many countries are building nuclear plants and plan to build even more.   Their reasons to build nuclear may satisfy them, but it is very interesting to note why nuclear cannot compete in the US: the price of natural gas is too low.   Many other countries, France included, also have vast resources of natural gas locked away in shale deposits that can be developed (as is the US) using directional drilling and hydraulic fracturing.  Producing such gas reserves domestically would reduce the price of natural gas, perhaps far below the oil-based pricing currently prevailing. 


As Germany reacted to the Fukushima disaster, declaring nuclear power a menace that will be shut down as soon as possible, other countries will very likely take the same decision.  While not wishing any ill effects on anyone anywhere, only one more major disaster such as Fukushima meltdowns and radiation release, would tip the scales in balance of no more nuclear power. 


 Previous Articles

The Truth About Nuclear Power emphasizes the economic and safety aspects by showing that (one) modern nuclear power plants are uneconomic to operate compared to natural gas and wind energy, (two) they produce preposterous pricing if they are the sole power source for a grid, (three) they cost far too much to construct, (four) use far more water for cooling, 4 times as much, than better alternatives, (five) nuclear fuel makes them difficult to shut down and requires very costly safeguards, (six) they are built to huge scale of 1,000 to 1,600 MWe or greater to attempt to reduce costs via economy of scale, (seven) an all-nuclear grid will lose customers to self-generation, (eight) smaller and modular nuclear plants have no benefits due to reverse economy of scale, (nine) large-scale plants have very long construction schedules even without lawsuits that delay construction, (ten) nuclear plants do not reach 50 or 60 years life because they require costly upgrades after 20 to 30 years that do not always perform as designed, (eleven) France has 85 percent of its electricity produced via nuclear power but it is subsidized, is still almost twice as expensive as prices in the US, and is only viable due to exporting power at night rather than throttling back the plants during low demand, (twelve) nuclear plants cannot provide cheap power on small islands, (thirteen) US nuclear plants are heavily subsidized but still cannot compete, (fourteen), projects are cancelled due to unfavorable economics, reactor vendors are desperate for sales, nuclear advocates tout low operating costs and ignore capital costs, nuclear utilities never ask for a rate decrease when building a new nuclear plant, and high nuclear costs are buried in a large customer base, (fifteen) safety regulations are routinely relaxed to allow the plants to continue operating without spending the funds to bring them into compliance, (sixteen) many, many near-misses occur each year in nuclear power, approximately one every 3 weeks, (seventeen) safety issues with short term, and long-term, storage of spent fuel, (eighteen)  safety hazards of spent fuel reprocessing, (nineteen) health effects on people and other living things, (twenty) nuclear disaster at Chernobyl, (twenty-one) nuclear meltdown at Three Mile Island, (twenty-two)  nuclear meltdowns at Fukushima, (twenty-three) near-disaster at San Onofre, (twenty-four) the looming disaster at St. Lucie, (twenty-five)  the inherently unsafe characteristics of nuclear power plants required government shielding from liability, or subsidy, for the costs of a nuclear accident via the Price-Anderson Act, and (twenty-six) the serious public impacts of large-scale population evacuation and relocation after a major incident, or "extraordinary nuclear occurrence" in the language used by the Price-Anderson Act.  Additional articles will include (twenty-seven) the future of nuclear fusion, (twenty-eight) future of thorium reactors, (twenty-nine) future of high-temperature gas nuclear reactors, and (thirty), a concluding chapter with a world-wide economic analysis of nuclear reactors and why countries build them.  Links to each article in TANP series are included at the end of this article.
















Part Twenty Three - San Onofre Shutdown Saga
Part Twenty Four - St Lucie Ominous Tube Wear
Part Twenty Seven - Power From Nuclear Fusion
Part Thirty - this article 

Roger E. Sowell, Esq. 
Marina del Rey, California